Construction completed on Forte Preparatory High School in Elmhurst

Construction completed on Forte Preparatory High School in Elmhurst
September 1, 2026

By Ethan Marshall
https://qns.com/neighborhoods/elmhurst/feed/

Construction recently wrapped up on Forte Preparatory High School, located at 78-02 Queens Blvd. in Elmhurst, just in time for the start of the 2026-2027 school year.

Standing six stories tall, the school features 59,000 square feet of classroom and recreational space for up to 560 students, who will range from 9th to 12th grade.

Photo courtesy of Apex Development Group LLC

In addition to the classrooms and large rooftop recreational space, other notable features of the school include a media center, an indoor gymnasium with a regulation high school basketball court, a cafeteria, dedicated spaces for the arts, teachers’ lounges and an outdoor terrace.

The school’s outdoor terrace. Photo courtesy of Apex Development Group LLC
The school’s gymnasium. Photo courtesy of Apex Development Group LLC

Student orientations are currently taking place through Thursday, Sept. 3. The first school year at Forte Preparatory High School will kick off on Tuesday, Sept. 8.

Photo courtesy of Apex Development Group LLC
Photo courtesy of Apex Development Group LLC

The school is within close proximity to the Grand Avenue-Newtown subway station, which provides service for the E, F, M and R trains, as well as bus stops for the Q58, Q59, Q60 and Q98 lines.

The school building has a facade composed of an insulated metal panel rainscreen, shaded in bright yellow, green and gray. The main entrance is on the northwest corner of the property, under a canopy that bears the name of the school. The building’s varied fenestration features narrow windows on the ground floor and a wide uniform grid from the second through fourth floors. A bulkhead rises against the line wall on the southern part of the structure.

Photo courtesy of Apex Development Group LLC

Prior to the construction of Forte Preparatory High School, 78-02 Queens Blvd. was occupied by a surface-level parking lot.

A surface-level parking lot previously stood at 78-02 Queens Blvd. in Elmhurst before the new school was built. Photo via Google Maps

Forte Preparatory High School was designed by the SBJ Group and developed by Apex Development Group LLC.

Photo courtesy of Apex Development Group LLC

Go to Source
Author: By Ethan Marshall

Subscribe
Notify of
guest
0 Comments
Oldest
Newest Most Voted